Strip Of 1/2-in.

Installing Vinyl Siding Over Wood Siding Many home-owners choose vinyl siding because it is relatively inexpensive, easy for a do-it-yourself er to install, resists insects and rot and never needs painting. Then slide the piece down to unlock and remove it. This 1⁄4 inch 0.6 cm gap allows for the expansion of vinyl siding in warm weather. The first panel at the bottom needs to be installed locked securely into the starter strip. Costs for local material / equipment delivery to and service provider transportation to and from the job site. CertainTeed has earned a reputation as a premier building materials’ manufacturer for more than 100 years. Lap it over the side flashing and window nailing fin. The corner posts should ladder from 3⁄4 inch 1.9 cm below the bottom of the starter strip to just beneath the eaves, after the soffit pieces have been installed. Cut and notch J-channel to fit over the top of the window. Snap a level chalk line around the bottom of the house, about an inch above the bottom of the existing wood siding, for a steel starter strip that will hold the bottom of the first row of vinyl siding. Think of it this way: Rain will need to make a sweeping motion from the roof, down the walls, and on to the Siding Colors ground without any retention or chances of getting in.

Some Useful Guidelines For Quick Plans Of How To Install Vinyl Siding

Cut the notch and use a snap-lock punch tool to make a series of indentations. It is more durable than other alternatives. Pre-primed Vinyl Siding: As it is pre-primed, it can be painted and therefore more choice of colons is available. Read and follow the manufacturer’s directions when you are installing vinyl siding. If panel is uncut or cut down in the “V”shaped groove of a piece of vertical siding, simply insert it into a 3/8″ 9.5mm J-channel, locking the other side on to the previously applied panel. Determine Lowest Point of Wall and Snap Chalkline Photo By: D – Do It Yourself Home Improvement ©2009 darling Kindersley Limited D – Do It Yourself Home Improvement, 2009 darling Kindersley Limited Make Chalk Line for First Piece Determine the lowest part of the wall that will be sided. Make sure installed panels and accessories move freely from side to side.

In new construction, it typically is installed over wood wall sheathing wrapped with rigid foam insulation and a moisture barrier. Costs for local material / equipment delivery to and service provider transportation to and from the job site. To keep this last cut row from collapsing against the house, nail a 3-in. strip of 1/2-in. plywood against the J-channel to hold it out. Chalk a level line indicating the top of the starter strip. Always leave a space of .25-inches between butted ends to allow for expansion and contraction between the seasons. Holding the panel in place, mark the two sides, then measure for the depth of the cut-out by determining how far the panel needs to come up so it can snap into place. You can purchase corner posts for the end panels. Use a snap-lock punch tool to punch the top edge of the panel along 6 inches 15.2 cm intervals, making sure the raised material is on the outside.